Offshore truss bridges
Full Tekla modelling and fabrication detailing for two sets of offshore truss bridges, designed to Eurocodes.
Sixteen design engineers in Bangalore, Chennai and Baroda. We take steel and plant projects from structural design to LOD 400 models, shop drawings and NC files, to AISC, BS EN, IS, AS and CISC codes.
When design, connections and detailing sit with different teams, the gaps show up as RFIs, rework and late steel. Here is how we mark them up.
Connections designed late, so detailers guess and the fabricator raises queries
Connections designed and FEA checked in IdeaStatiCa before detailing starts
Clashes with piping and MEP found during erection
Steel, piping and MEP coordinated in one model, clashes cleared at LOD 350 to 400
Drawings drafted to the wrong code, client standards missed
Six design codes in daily use, your drawing standards built into our checklists
No spare capacity when three packages land in one month
A team of 16 that scales up for your peak loads
Conceptual layout, load calculations, analysis and optimisation. GA drawings and calc reports, then foundation load data and foundation design.

Moment, shear, bracing and base plate connections, checked by 3D FEA to AISC, BS or EN, with full utilisation reports and anchor bolt setting plans.

Full connection models with weld numbering, stairs, ladders and handrails, clash checked against piping and MEP before a single drawing is cut.

Erection, assembly and single part drawings, NC, DXF, IFC and KISS files, an Advance Material List and weld traceability, then as built records at close out.

One team from concept to fabrication. Every connection designed, checked and detailed before it reaches your shop.









GA drawings or a design model, the design code, the drawing types you need and your dates. Native files, PDFs or IFC all work.
A senior engineer reviews the scope, flags gaps in the inputs and sends back the approach, deliverable list and schedule with the quote.
We model, run multi level checks and issue in agreed batches, with weekly reviews and RFIs tracked in RFI Manager for Tekla.

Full Tekla modelling and fabrication detailing for two sets of offshore truss bridges, designed to Eurocodes.

Primary steel, stairs, gratings, cage ladders and pipe supports, issued with NC and IFC files and weld traceability.

MEP, structure and equipment modelled to fabrication detail.

Piping, MEP and structure coordinated with clashes resolved in the model.

Architecture, structure and MEPF coordination through to shop drawings.

MEP and equipment coordination across the production hall.

COBie data with architecture, structure and MEP coordination for handover.
A DMAIC based quality system with checklists at every stage and the delivery metrics tracked on every job.



AISC (USA), BS EN and Eurocodes (UK and Europe), IS (India), AS (Australia) and CISC (Canada) for design, and AWS for welding. Tell us your client's drawing standards and we build them into our checklists.
Tekla Structures for modelling and detailing, STAAD.Pro for analysis, IdeaStatiCa for connection design, and Revit, AutoCAD Plant 3D and AVEVA E3D for BIM. You receive erection, assembly and single part drawings, NC, DXF, IFC and KISS files, an Advance Material List and the native model.
Both. We design moment, shear, bracing and base plate connections in IdeaStatiCa with 3D FEA checks, issue calc reports with full utilisation checks, then detail from that design in Tekla.
Every package goes through stage checklists and multi level technical reviews under revision control. We track first pass yield and on time delivery, and run a root cause analysis on any issue raised.
Yes. Our team of 16 design engineers and Tekla specialists is deployed flexibly for peak loads. We agree issue batches up front so your shop can start on the first assemblies early.
Yes. Recent work includes an oil refinery process structure in the United Kingdom to BS EN and two sets of offshore truss bridges to Eurocodes.
You get weekly reviews and status reports, a Gantt based schedule, and RFIs tracked through to closure, including RFI Manager for Tekla. A senior engineer stays your point of contact.
Yes. With our reality capture partner MAPPA, a FARO partner since 2016, we scan the site and build as built models with deviation and compliance reports, for renovation and plant upgrades.
Yes. We are happy to sign your NDA before you share any files, and project data stays within the team working on your job.
GA drawings or a design model, the design code, the deliverables you need (for example LOD, drawing types and NC files) and your target dates. PDFs, DWG, IFC or native models all work.
Tell us about the structure, the code and your dates. A senior engineer reads every enquiry.